Latest news from the Environment Agency:
The flow through Monksleaze Clyce is
being reduced and is now operating within ‘normal’
parameters. This will reduce flows through the Sowy and King
Sedgemoor Drain system.
Due to improving
conditions and the reduced flow through the Sowy, the large temporary
pumps at Beer Wall (A372) near Aller are no longer needed and have
now been removed. The A372 will
remain closed after the pumps are removed so that Somerset County
Council Highways can undertake an assessment of the flood damage
caused and carry out emergency repair works to ensure the road is
safe for users.
No comments:
Post a Comment
Type your comment in the box below, if you don't have an account listed in the 'Comment as' dropdown, please sign with your name or URL. Then click 'Post comment'.
Note: only a member of this blog may post a comment.